Warping Behind Schedule

I started this warping process with a fine 20/2 cotton thread about three days ago. Things were going well and I made the first of the two warps which will only be about 5″ wide, sett is 36 epi. Two nights ago I decided it will be beamed onto the Glimakra table loom.


Above, is one-fourth of the drawloom warp, counting thread on, and just before adding cross and choke ties. I’m making it in four 4″ sections, 64 epi, and 18 yards in length. The overall width will be 16″ for a total of 1,024 threads, placed on the warping mill one thread at a time. I’ve already decided I’ll be experimenting with making these warps perhaps 4 threads at a time using a fixed warping paddle.

This mill is 3 yards around, so to make the warp in two sections, I would have had to shorten the length of the warp. Since my drawloom has the long extension on it, and I did not want to re-warp and re-thread right away, I decided 18 yards would be good. Trying to squeeze more threads onto the mill would, in my opinion, be risking tangling of threads or worse.

So, why am I not done? I’ve been distracted! A couple weeks ago I’d started to set up an online shop on 1000 Markets, and submitted it for approval on July 4th. Three days later an email arrived requesting I retake photos of the towels in natural light. So I spent two days taking photos of both the towels and socks (might as well do them over, too), somewhere over 100 photos. After deleting most of the pictures and keeping those I thought were okay, I resubmitted for approval again a couple days ago.

Last night, around 10:45 PM, an email arrived saying my shop was Live! Now, I’m busy learning my way around 1000 Markets, reading in the Forums, browsing through Markets to determine where I might fit, and so on. Today I requested being part of two markets, and heard back from one almost immediately. I still need to set that up, and perhaps post a first blog entry there, hopefully tomorrow.

So in-between all this online time, I have been working on my fine warps. Half the drawloom warp is done, and I’ll be back at the warping mill again tomorrow. I’m really looking forward to threading, though I’m thinking when that is done I’ll definitely need new glasses.

It’s cool again tonight, around 50 degrees out, but the Whippoorwill has been singing away since just after dark. He sings me to sleep every night, just under my bedroom window.
.

2 thoughts on “Warping Behind Schedule”

Leave a Reply